Skip to content

Heated Oxygen Sensor Heater Resistance Learned Values Reset

Engine Controls and Fuel - 5.3L L84 or 6.2L L87 | Repair Instructions | Document ID: 5391246 Heated Oxygen Sensor Heater Resistance Learned Values Reset Diagnostic Instructions Perform the Diagnostic System Check prior to using this diagnostic procedure: Diagnostic System Check - Vehicle Review the description of Strategy Based Diagnosis: Strategy Based Diagnosis Description This procedure resets the control module learned values of the component/system: B52 Heated Oxygen Sensor — Resistance When to Perform the Procedure

  1. Ignition » On / Vehicle » In Service Mode
  2. Select: Module Diagnostics
  3. Select: Engine Control Module
  4. Select: Configuration/Reset Functions
  5. Select: Reset Functions
  6. Select: Heated Oxygen Sensor Heater Resistance Learned Values Reset
  1. Follow the instructions on the scan tool. — The procedure will complete within 10 s
  2. All OK. Repair Instructions Perform the Diagnostic Repair Verification after completing the repair: Diagnostic Repair Verification